Our Projects
Etzel Engineer & Build Projects
Our Projects
Featured Projects
Standard Farms Cleveland Ohio
Standard Farms first medical marijuana processing facility, open office, locker rooms, extraction room, two loading docks, full security, regulated project.
Read more
Faros Properties
Demolition of existing entryway and construction of a new steel and cedar wood trellis canopy and set of learning steps off of Federal St.
Read more
Data Bank Nova Place
This project consisted of work on multiple floors of the NOVA Place complex to support the construction of approximately 10,500 SF of new data center space on the Terrace level. Also on the Terrace level, we built an additional 6,000 SF of support office space and ‘A’ and ‘B’ electrical distribution rooms. The remaining electrical infrastructure including the electric utility entrance, emergency generators and main switchgear located two floors below on the upper garage level.
Completion of this project also included:
· 10,500 sf of 24” high raised access floor
· (2) 2500 KW Generators
· (2) Utility Service Entrance Vaults
· (2) 3000 Amps Main PLC Switchboards
· (4) 750 KW Uninterrupted Power
· (6) 150 KVA Power Distribution Units installed Day One, future expansion of (6) additional units
· 288 tons of Data Center cooling Day One, future expansion of 192 additional tons of cooling
Read more
Completion of this project also included:
· 10,500 sf of 24” high raised access floor
· (2) 2500 KW Generators
· (2) Utility Service Entrance Vaults
· (2) 3000 Amps Main PLC Switchboards
· (4) 750 KW Uninterrupted Power
· (6) 150 KVA Power Distribution Units installed Day One, future expansion of (6) additional units
· 288 tons of Data Center cooling Day One, future expansion of 192 additional tons of cooling
Linwood Crest Senior Care
New construction of senior care residential slab-on-grade (SOG) homes
Read more
Iron Mountain Meet Me Room
Expansion of current meet me rooms, the point in the building where diverse fiber and telecoms feeds enter.
Read more
Gaiser Center New Building
Construction of a new administration building for Gaiser Addiction Center.
Read more
Expedient Cleveland Data Center 3
Renovated existing space for a new data center and support space.
Read more
DQE Greensburg Hub
Installed a prefabricated building with new generator and fiber feeds; installed air conditioning and ran power from a nearby utility feed.
Read more
Comcast Bethel Park Data Center
New HVAC cooling equipment and enclosures, new lighting and conduit, and new direct current (DC) power equipment.
Read more
Family Pathways Commercial Building
3-story building addition - offices and meeting rooms.
Read more