Design-Lead Performance Builders

DQE 4th Avenue Systems Upgrade

Upgraded the HVAC system, including the new rooftop drycoolers, indoor CRAC units and piping from the roof to the fourth floor.  Electrical power to HVAC units and new automatic transfer switch with remote temporary generator connection box.

Site Superintendent:  Stan Maciejewski

 

Pictures of the Drycooler Installation on August 1, 2015.